Category Archives: PLANNING BOARD

Planning Board Agenda – 2/9/16

Marilou Blaine added a comment when she sent the minutes to remind people that the meeting will probably be held downstairs because if Primary voting. – Lil

 

PLANNING BOARD AGENDA

WALPOLE TOWN HALL

Tuesday, February 9, 2016

                               7 p.m.                         

 

Roll Call – Appointment of alternates if needed

Minutes – Review minutes of the December meeting and Petition Hearing minutes.

Old Business:

Edward Potter – Public Hearing for a Lot Line Adjustment for Map 7, Lots 21 and 22-1     Old Keene Road, Rural/Agricultural District.  Number of acres proposed: Lot 21 3.9 acres and lot 22-1  1.4 acres with road frontage 37.29 feet on Macri Lane and 229.55 feet for 22-1 on Old Keene     Road.

New Business:

                Matt Blanc and the Potato Barn: project: Blanc has been to NH DOT but road plan was rejected.  He’s got some ideas for other options. Also, revisit fire code and sprinklers. Someone from the Walpole Fire Dept. will attend the meeting.

Greg Gay, Building in North Walpole.

 

Next meeting Tuesday, March 8, 2016.

Planning Board Meeting Minutes – 1/12/16

Walpole Town Hall

January 12, 2016 Minutes

 

Presiding: Jeffrey Miller (Chair), Robert Miller (Vice-Chair), James Aldrich, (Secretary),Steve Dalessio (Selectboard Representative), Dennis Marcom, Jason Perron.

Alternates: Ed Potter and Jeff White.

Absent: Kelley Hicks

Recording: Marilou Blaine.

Meeting Opened: Mr. J. Miller, Chair, called the meeting to order at 7 pm.

 

Roll Call: One board members was absent so Mr. Miller asked Alternate Jeff White to sit in her place.

Minutes: Mr. Marcom made a revision to the December minutes. The revision was insserted after the paragraph that begins with “Mr. Ed Potter agreed.” the paragraph before that was eliminated.

Mr. Marcom said “that approvals of the site plans are based on the assumption that the applicant will adhere to the terms of that approval. That assumption of trust is critical. In this case, Mr. Ruggiero was granted a special exception by the Zoning Board in 2011. Conditions, as stated in a letter from that Board, included that the operation could not be changed or expanded without returning to the ZBA for approval. When Mr. Ruggiero added a 2,000 square-foot building, he not only violated the town’s rules on building permits, but also broke at least one of the conditions of the Special Exception.

“Beyond that, this company, as was made evident in a letter sent to them by DES, operated for approximately 2 ½ years without the knowledge of DES, among other violations of state regulations.” For these reasons, Mr. Marcom felt that this company could not be ensured to keep their agreements and therefore approval should not be granted to them.

Another correction was the date of the Silverstein subdivision. Mr. Dalessio pointed out that it could not be 2019.

Mr. R. Miller corrected  the spelling of the name of the man he contacted at the New Hampshire Municipal Offices. It should be Cordell Johnston. He also said said Ms. Pauline Barnes statement that  the vote to seek counsel was 6 to 0 because the Chair was absent. Actually, the vote was 7 to 0 as an alternate had replaced the chair as a voting member.

Mr. Perron made a motion to accept the minutes as amended. Mr. R. Miller seconded the motion and it was approved unanimously.

 

Old Business:

Public Hearing for Subdivision of one lot into two lots. William and Elisabeth Silverstein,     70 Reservoir Road, Map 10, Lot 33, Rural/Agricultural District. Lot 33 will be 1.43 acres, Lot 33-3 will be 1.53 acres and road frontage is 320 feet and 277.57 feet on Reservoir           Road respectively. 

Mr. Silverstein said that he and his wife were here a month ago and submitted an application for a subdivision and the Board voted unanimously to hold a Public Hearing. He said the subdivision was pretty straightforward. The lots were divided before and there is plenty of road frontage.

Mr. J. Miller asked the audience and Board if there were any questions. There being none, Mr. J. Miller closed the Public Hearing.

 

Old Dominion Lighting – The previous problem of light from Old Dominion shining into a bedroom of the Tabitha and Frank Anderson home abutting Old Dominion, seem to be solved. Mr. Dalessio asked Mrs. Anderson if she was happy with the response from Old Dominion. Mrs. Anderson said she was. “They were very good about it,” she said.

However, those were the old lights. Mrs. Anderson said that it looks like from the paper work that there are 11 more lights to be installed. These lights are to be installed in late January. Mrs. Anderson will notify the secretary if there are any problems after the new lighting is installed. Mr. Marc Mercier, project manager for Old Dominion, is keeping in touch with the Board.

Mr. Perron asked about the other condition from the Walpole Fire Department. Mark Houghton of the Walpole Fire Department said that the Knox boxes had been installed and tested and that Old Dominion had fulfilled that condition of the Site Plan.

 

Bensonwood – Mr. Tom Hancock of Bensonwood submitted a copy of a letter from the Department of Environmental Services granting an Alteration of Terrain Permit. The permit was needed to fulfill the condition placed on Bensonwood for final approval of the Site Plan.

 

Potato Barn – Matt Blanc received a letter from Herb Hurlburt, Captain Fire Inspector of the Walpole Fire/Ems Department, stating that the fire department will not sign off on any usage of the Potato Barn at this time. Mr. Hurlburt said that at the original meeting he ”was assured the complete building would be sprinkled and alarmed before ANY usage”  Mr. J. Miller asked that the letter be part of the Potato Barn file.

 

New Business:

Mr. Ed Potter and Mr. Bruce Potter are seeking a Lot Line Adjustment of their property       on Old Keene Road, Map 7, Lots 21 and 22-1 and Lot in the Rural/agricultural Zone. Take .23 acres from Lot 21 and add it to Lot 22-1, thus changing the western boundary line. Mr. Ed Potter requested a Public Hearing.         

Mr. Potter said about a year ago he bought a lot from Steve Brode that was 1.17 acres and the lot had enough road frontage to be developed. There is a line between the two properties that has a kind of “jag” in it, he said. Because he owns the field next to it he said he wanted to have better access to that property and also wanted to straighten the line. The adjustment would take .23 acres from Lot 21 and add it to 22-1. Mr. Potter also planted some arborvitae bushes on the new property line.

Mr. Dalessio asked who owned the property – where the property was coming from. Mr. Potter said it was his sister’s property and it is now owned by his brother and himself.

Mr. J. Miller made a motion to have a Public Hearing next month. The motion was seconded and it passed unanimously.

 

Explanation of a petition to be placed on the March 2016 warrant and a request for a Public Hearing. This petition will amend the current Zoning Ordinance as follows :

Mr. J. Miller said this is basically a brief for that article and set a hearing for February 26 at 7:00 pm.

The petition is:

To see if the Town of Walpole will vote in favor of amending the current Zoning Ordinance as follows:

Add under Article IV General Provisions Section N Recycling and Transfer Stations:

  1. In addition to the current Town recycling center at 207 Whitcomb Road, Route 123, Walpole, New Hampshire, recycling centers and/or transfer stations shall be permitted uses in the Industrial Zone subject to meeting the Town’s site plan review regulations and shall be submitted to the Planning Board for site plan review provided such facilities are owned or operated by the Town for the transfer and/or recycling of solid waste generated in the Town and provided further that the recycling center or transfer station is owned and operated by the Town or by a Regional Solid Waste District whose ownership or operation thereof is governed by and agreement entered into pursuant to RSA 149-M124.

Ms. Pauline Barnes is the person who wrote and circulated the petition. She asked to correct one typo, the RSA No. to RSA 129-M24. Mr. J. Miller said she could change the typo but not the intent of the petition. He asked her to explain the petition.

Ms. Barnes said that Walpole already had an award-winning recycling center run by an award-winning director and the facility is fully capable to handle the solid waste of our town. Because of the nature of solid waste it is important that the facility be operated only under town ownership and town control.

Mr. Aldrich asked Ms. Barnes to clarify the typo and asked if we should strike the 1 from the RSA number. Ms. Barnes agreed.

Mr. R. Miller made a motion to have a Public Hearing on January 26, 2016, Mr. Aldrich seconded the motion and the motion unanimously passed.

 

Mr. Dalessio encouraged everyone to come out not only for the petition hearing but the budget hearing and all the other meetings that will be going on in the next couple of weeks.

Mr. J. Miller asked Ms. Barnes if she understood the process. Mr. Miller said the vote on the petition will be on the second Tuesday in March, when citizens vote on selectmen, school board, etc. The function of the Board is not to vote to accept or reject the petition, but vote to recommend or not recommend the petition to the townspeople.  The Board decision would appear at the bottom of the article. In all cases, the petition will be placed on the ballot.

At the Public Hearing, it will be up to the petitioner to explain the petition, just like you did tonight, Mr. J. Miller said. And answer questions from the public, Mr. Perron added.

Mr. Dick O’Brien asked if the Board voted on the article. Mr. Miller answered it is just a recommendation.

Mr. Adrian Basora asked if the petitioner needed a lawyer and if there were going to be lawyers on the other side. Mr. Miller said there will be no vote. The public will vote on the petition in March.

Mr. J. Miller repeated his explanation saying this has nothing to do with a Board vote. And you don’t have to have a show of hands from the public.

A motion was made, seconded and passed by the Board to adjourn the meeting and then realized it had not made a decision on the Silverstein subdivision. Mr. Marcom made a motion to reopen the meeting, it was seconded and it passed unanimously.

Mr. Aldrich made a motion to accept the Silverstein subdivision as presented. Mr. R. Miller seconded the motion and the Board vote unanimously to do so.

 

The meeting was adorned at 7: 25 pm.

 

Respectfully submitted,

Marilou Blaine

 

Minutes posted inside the Town Hall, on the outside bulletin board at Walpole Grocery.

Cc: WPB, The Walpolean, Town Web site www.walpolenh.us

 

Next meeting January 26, 2016 to hear the Public Hearing on the petition.

Next regular meeting February 9, 2016.

 

Revised Planning Board Minutes

Walpole Planning Board

Walpole Town Hall

December 8, 2015 Minutes

7 p.m.

 

Presiding: Jeffrey Miller (Chair), Robert Miller (Vice-Chair), James Aldrich, (Secretary), Steve Dalessio (Selectboard Representative), Dennis Marcom, Jason Perron.

Alternates: Ed Potter, Jeff White.

Absent: Kelley Hicks, member.

Recording: Marilou Blaine. These minutes were revised at the January 12, 2016 meeting.

Call to Order: Mr. J. Miller called the meeting to order at 7 p.m.

Roll Call: One board member was absent so Mr. Miller asked Alternate Ed Potter to sit in her place.

Minutes: Mr. Marcom made a motion to accept the minutes as written. The motion was seconded and the board approved the motion.

            Old Business:Hearing for a Site Plan Review – (continued from October meeting)   Ruggiero Processing Facility, LLC, 32  Industrial Park Road, Map 1, Lot 10-1, Zoning   District Industrial – wishes to add another 2,500 square-foot pole barn, new access road,      trailer for employee break room and a scale near the entrance to the property. Joe       Ruggiero owner, Rob Hitchcock of SVE Associates, Tom Hanna, lawyer.

Mr. J. Miller continued the meeting from October and said that the Public Hearing review period had been completed. He said the applicant asked that all proceedings be continued pending some clarifications from Superior Court. At the last meeting there was some talk about the Planning Board getting local counsel. The Planning Board decided that they were pretty clear on the issues so that we didn’t think we needed clarification, Mr. Miller said.

Ms. Pauline Barnes said she was here when the Planning Board voted 6 to zero to get counsel. At what point did the Planning Board rescind that vote? she asked. Mr. R. Miller, at the January meeting, changed this to 7 to 0 because he had appointed an alternate to replace the Chair.

Mr. Eric Merklein asked that the Planning Board chair to recuse himself from the matter since he wasn’t at the meeting in October when the Planning Board voted to seek counsel. The abutters have made a good case for their problems, Mr. Merklein said. He then mentioned a letter from Mr. Ruggiero’s attorney, Mr. Tom Hanna, and the letter said Mr. Hanna had been waiting to meet with the Planning Board’s counsel but the Board had decided not to seek an attorney’s advice.

At this point Mr. J. Miller interrupted Mr. Merklein saying that the Public Hearing had been closed and that the discussion was not open for comments from the public. This is for the Board to discuss and make a decision, Mr. J. Miller said.

Mr. J. Miller then asked if members of the Board agreed with him that the Board knew what the issues were and that they could make a decision without counsel.

 Mr. Marcom disagreed with Mr. J. Miller. He said that the Planning Board had made a motion to seek counsel and he felt that what was voted should have been done.

Mr. Ed Potter agreed with Mr. J. Miller and said he thought they should continue and wait to see what happened. He made a motion to continue with the application. It was seconded by Mr. Aldrich but was voted down 7-0 by the Board.

Mr. Marcom said “that approvals of site plans are based on the assumption that the applicant will adhere to the terms of that approval. That assumption of trust is critical in this case. Ruggerio was granted a special exception by the Zoning Board in 2011. Conditions, as stated in a letter from that Board, included that the operation could not be changed or expanded without returning to the ZBA for approval. When Ruggiero add a 2,000 square-foot building they not only violated the town’s rules on building permits but also broke at least one of the conditions of the Special Exception.

“Beyond that this company, as was made evident in a letter sent to them by DES, operated for approximately 2 ½ years without the knowledge of DES, among other violations of site regulations.” For these reasons, Mr. Marcom felt that the company could not be ensured to keep their agreements and therefore approval should not be granted to them.

Mr. Dalessio said that there wasn’t a motion to reconsider the October vote. He also said the Ruggiero  application was incomplete.

Mr. Aldrich agreed that the application was incomplete and added that the matter should have gone back to the Zoning Board.

Mr. R. Miller said that on Monday he had spoken with a Mr. Cordell Johnston of the N.H. Municipal Association with respect to the Ruggiero proposal. Mr. Johnston said he had heard a little of the background,. Mr. Johnston said that he couldn’t predict how a court would rule on this case but DES, the Department of Environmental Services, does not preempt town rules and regulations. He was going to send a letter stating that but it had not arrived as of today.

Mr. R. Miller continued that he had six reasons for disapproval. They were:

  1. It is the wrong site for the proposed commercial business as it is located in an Industrial District and this business does not meet Walpole zoning requirements for the Industrial District.
  2. Pollution from noise, odor and possible rodents and the welfare of neighbors could very well be at risk.
  3. It is very likely that property values could be adversely impacted, not only affecting the businesses in this industrially zoned area but there are several homes that abut this proposed commercial venture that will most likely adversely impact the well being of the homeowners and their families.
  4. Walpole has an award-winning recycling center that is able to process all of Walpole’s MSW.
  5. No where in the Town’s Master Plan is it indicated that Walpole should become the processing center of MSW for southern New Hampshire, southern Vermont and northern Massachusetts.
  6. The Town of Walpole has spoken, “we do not need nor want this operation in our town.”

A motion was made to deny the applicant’s site plan request by Mr. Aldrich. It was seconded by  Mr. R. Miller and passed unanimously 7-0 by the Board.

 

New Business: Subdivision – William and Elizabeth Silverstein of 70 Reservoir Road would like to request a Public Hearing for a Subdivision of the property. Map 10, Lot 33, Rural/Agricultural District.

Mr. William Silverstein said that he and his wife had recently purchased property on Reservoir Road and he wanted to subdivide it. It had been subdivided once before and then the two parcels of land were put back together in a voluntary merger on May 2012. The subdivision would divide the property into two lots: one Lot 33 with 1.43 acres of land and 320 feet of road frontage; and another Lot 33-3 would be 1.53 acres with 277 feet of road frontage.

Mr. J. Miller asked if someone would make a motion to have a Public Hearing on the subdivision next month. A board member said “so moved,” Mr. Aldrich seconded the motion and it was approved unanimously by the Board.

 

Hubbard Farms LLC, 195 Main Street,  Public Hearing for a Subdivision, Map 22, Lot 5.      There will be three subdivisions of the 13.7 acre property – 8 acres for the office           building,.0.3 acres for the barbecue pit, which will be donated to the town, and  5.54        acres for the two outbuildings used for storage and maintenance.

Mr. Chip O’Brien said he was representing Hubbard Farm and the subdivision in question was at the Office Site at 195 Main Street. He said the right of way to the recreation center was well marked on this map and it is 20 feet wide. The barbecue will be annexed to the Recreation Center and given to the town.

Mr. Dalessio said the Selectboard has voted and had a Public Hearing on that matter and agreed to annex it and officially accepted it.

Mr. J. Miller asked if would be a separate lot. Mr. Dalessio responded it would be merged with the Recreation Center property. The Public Hearing was closed at 7:25 p.m.

Mr. Aldrich made a motion that the Board accept the subdivision as presented. Mr. Potter seconded the motion and the motion passed unanimously by the Board.

 

Old Dominion submitted a plan for lighting for its facility in the Industrial Park, which was one of the requirements for approval of their Site Plan. Mr. Frank Anderson said that the lighting is supposed to be LED lighting and down lit but it appears that something went wrong with one or more of the lights. Mr. Anderson‘s property abuts Old Dominion and the light is coming through the woods into his yard.

Mr. Dan Nash and Mr. Marc Messier, who represented Old Dominion at the Public Hearing, will be advised of the problem.

Also, there needs to be a letter from the fire department that those conditions made at the time of their hearing have been taken care of and installed. They were mainly about having Knox boxes at a couple of locations.

 

Northcott mylar: Scott and Judith Northcott submitted a subdivision plan on Valley Road, which the Planning Board approved this Spring but it was not a legal subdivision because a road went through a portion of the property in the the subdivision. Mr. Dalessio said that the Selectboard sorted out the issue and the mylar now had the correct subdivision. Mr. J. Miller and Mr. R. Miller signed it.

The meeting adjourned at 7:40 pm.

 

Respectfully submitted,

Marilou Blaine

Planning Board Meeting Minutes – 12/8/15

Walpole Planning Board

 Walpole Town Hall

December 8, 2015 Minutes

7 p.m.

 

Presiding: Jeffrey Miller (Chair), Robert Miller (Vice-Chair), James Aldrich, (Secretary), Steve Dalessio (Selectboard Representative), Dennis Marcom, Jason Perron.

Alternates: Ed Potter, Jeff White.

Absent: Kelley Hicks, member.

Recording: Marilou Blaine. These minutes are unapproved and will be reviewed at the January 2016  meeting for corrections, additions and/or omissions.

Call to Order: Mr. J. Miller called the meeting to order at 7 p.m.

Roll Call: One board member was absent so Mr. Miller asked Alternate Ed Potter to sit in her place.

Minutes: Mr. Marcom made a motion to accept the minutes as written. The motion was seconded and the board approved the motion.

            Old Business:Hearing for a Site Plan Review – (continued from October meeting)   Ruggiero Processing Facility, LLC, 32  Industrial Park Road, Map 1, Lot 10-1, Zoning   District Industrial – wishes to add another 2,500 square-foot pole barn, new access road,  trailer for employee break room and a scale near the entrance to the property.  Joe   Ruggiero owner, Rob Hitchcock of SVE Associates, Tom Hanna, lawyer.

Mr. J. Miller continued the meeting from October and said that the Public Hearing review period had been completed. He said the applicant asked that all proceedings be continued pending some clarifications from Superior Court. At the last meeting there was some talk about the Planning Board getting local counsel. The Planning Board decided that they were pretty clear on the issues so that we didn’t think we needed clarification, Mr. Miller said.

Ms. Pauline Barnes said she was here when the Planning Board voted 6 to zero to get counsel. At what point did the Planning Board rescind that vote? she asked.

Mr. Eric Merklein asked that the Planning Board chair to recuse himself from the matter since he wasn’t at the meeting in October when the Planning Board voted to seek counsel. The abutters have made a good case for their problems, Mr. Merklein said. He then mentioned a letter from Mr. Ruggiero‘s attorney, Mr. Tom Hanna, and the letter said Mr. Hanna had been waiting to meet with the Planning Board’s counsel but the Board had decided not to seek an attorney’s advice.

At this point Mr. J. Miller interrupted Mr. Merklein saying that the Public Hearing had been closed and that the discussion was not open for comments from the public. This is for the Board to discuss and make a decision, Mr. J. Miller said.

Mr. J. Miller then asked if members of the Board agreed with him that the Board knew what the issues were and that they could make a decision without counsel.

 Mr. Marcom disagreed with Mr. J. Miller. He said that the Planning Board had made a motion to seek counsel and he felt that what was voted should have been done.

As for Mr. Ruggiero‘s application that was for construction debris. Mr. Marcom continued that the Zoning Board granted the Special Exceptions with certain conditions, one being that there should be no changes unless Mr. Ruggiero go back to the Board for permission.  He did not do that but he made changes anyway. This speaks to trust, Mr. Marcom said. Mr. Ruggiero was doing both construction debris and MSW.

Mr. Ed Potter agreed with Mr. J. Miller and said he thought they should continue and wait to see what happened. He made a motion to continue with the application. It was seconded by Mr. Aldrich but was voted down 7-0 by the Board.

Mr. Dalessio said that there wasn’t a motion to reconsider the October vote. He also said the Ruggiero application was incomplete.

Mr. Aldrich agreed that the application was incomplete and added that the matter should have gone back to the Zoning Board.

Mr. R. Miller said that on Monday he had spoken with a Mr. Kordell Johnson of the N.H. Municipal Association with respect to the Ruggiero proposal. Mr. Johnson said he had heard a little of the background. Mr. Johnson said that he couldn’t predict how a court would rule on this case but DES, the Department of Environmental Services, does not preempt town rules and regulations. He was going to send a letter stating that but it had not arrived as of today.

Mr. R. Miller continued that he had six reasons for disapproval. They were:

  1. It is the wrong site for the proposed commercial business as it is located in an Industrial District and this business does not meet Walpole zoning requirements for the Industrial District.
  2. Pollution from noise, odor and possible rodents and the welfare of neighbors could very well be at risk.
  3. It is very likely that property values could be adversely impacted, not only affecting the businesses in this industrially zoned area but there are several homes that abut this proposed commercial venture that will most likely adversely impact the well being of the homeowners and their families.
  4. Walpole has an award-winning recycling center that is able to process all of Walpole’s MSW.
  5. No where in the Town’s Master Plan is it indicated that Walpole should become the processing center of MSW for southern New Hampshire, southern Vermont and northern Massachusetts.
  6. The Town of Walpole has spoken, “we do not need nor want this operation in our town.”

A motion was made to deny the applicant’s site plan request by Mr. Aldrich. It was seconded by  Mr. R. Miller and passed unanimously 7-0 by the Board.

New Business: Subdivision – William and Elizabeth Silverstein of 70 Reservoir Road would like to request a Public Hearing for a Subdivision of the property. Map 10, Lot 33, Rural/Agricultural District.

Mr. William Silverstein said that he and his wife had recently purchased property on Reservoir Road and he wanted to subdivide it. It had been subdivided once before in December  of 2019 and then the two parcels of land were put back together in a voluntary merger on May 2012. The subdivision would divide the property into two lots: one Lot 33 with 1.43 acres of land and 320 feet of road frontage; and another Lot 33-3 would be 1.53 acres with 277 feet of road frontage.

Mr. J. Miller asked if someone would make a motion to have a Public Hearing on the subdivision next month. A board member said “so moved,” Mr. Aldrich seconded the motion and it was approved unanimously by the Board.

Hubbard Farms LLC, 195 Main Street,  Public Hearing for a Subdivision, Map 22, Lot 5. There will be three subdivisions of the 13.7 acre property – 8 acres for the office building, 0.3 acres for the barbecue pit, which will be donated to the town, and  5.54 acres for the two          outbuildings used for storage and maintenance.

Mr. Chip O’Brien said he was representing Hubbard Farm and the subdivision in question was at the Office Site at 195 Main Street. He said the right of way to the recreation center was well marked on this map and it is 20 feet wide. The barbecue will be annexed to the Recreation Center and given to the town.

Mr. Dalessio said the Selectboard has voted and had a Public Hearing on that matter and agreed to annex it and officially accepted it.

Mr. J. Miller asked if would be a separate lot. Mr. Dalessio responded it would be merged with the Recreation Center property. The Public Hearing was closed at 7:25 p.m.

Mr. Aldrich made a motion that the Board accept the subdivision as presented. Mr. Potter seconded the motion and the motion passed unanimously by the Board.

Old Dominion submitted a plan for  lighting for its facility in the Industrial Park, which was one of the requirements for approval of their Site Plan. Mr. Frank Anderson said that the lighting is supposed to be LED lighting and down lit but it appears that something went wrong with one or more of the lights. Mr. Anderson’s property on Black Jack Crossing abuts Old Dominion and the light is coming through the woods into his yard.

Mr. Dan Nash and Mr. Marc Messier, who represented Old Dominion at the Public Hearing, will be advised of the problem.

Also, there needs to be a letter from the fire department that those conditions made at the time of their hearing have been taken care of and installed. They were mainly about having Knox boxes at a couple of locations.

Northcott Mylar: Scott and Judith Northcott submitted a subdivision plan on Valley Road, which the Planning Board approved this Spring but it was not a legal subdivision because a road went through a portion of the property in the the subdivision. Mr. Dalessio said that the Selectboard sorted out the issue and the mylar now had the correct subdivision. Mr. J. Miller and Mr. R. Miller signed it.

The meeting adjourned at 7:40 pm..

Respectfully submitted,

Marilou Blaine

 

Planning Board Agenda – 12/8/15

PLANNING BOARD AGENDA

WALPOLE TOWN HALL

Tuesday, December 8, 2015

7:00 PM

                                  

Roll Call – Appointment of alternates if needed

Minutes – Review minutes of the November meeting.

Old Business:

Public Hearing for a Site Plan Review – (continued from October meeting)    Ruggiero Processing Facility, LLC, 32  Industrial Park Road, Map 1, Lot 10-1,  Zoning District Industrial – wishes to add another 2,500 square-foot pole barn, new access road, trailer for employee break room and a scale near the entrance to the property. Joe Ruggiero owner, Rob Hitchcock of SVE Associates, Tom Hanna, lawyer.

Hubbard Farms LLC, 195 Main Street, Request for a Public Hearing for a  Subdivision, Map 22, Lot 5. There will be three subdivisions of the 13.7 acre property – 7.86 acres for the office building, 3 acres for the barbecue pit, which will be donated to the town, and  5.54 acres for the two outbuildings used for storage and maintenance. Chip O’Brien

 

New Business:

William and Elizabeth Silverstein of 70 Reservoir Road would like to request a Public Hearing for a Subdivision of the property. Map 10, Lot 33, Rural/Agricultural District.

Approval of Old Dominion Lighting.

 

Next meeting Tuesday, Jan. 12 2016.

 

Planning Board Workshop – 10/27/15

Walpole Planning Board Workshop

October 27, 2015

Present: Planning Board: Jeff Miller (Chair), Robert Miller (Vice-Chair), James Aldrich (Secretary), Steve Dalessio (Selectboard Representative), Jason Perron, Dennis Marcom. Alternates: Jeff White and Ed Potter.

Zoning Board Members: Myra Mansouri ( Chair), Jan Le Clerc (Vice-Chair), Ernie Vose (Clerk).

Recording: These minutes are unapproved and will be reviewed at the November 10, 2015, meeting for corrections, additions and/or omissions.

The meeting was called to order around 7 p.m. The topic again was Special Exceptions. Four of the Districts in the Zoning Ordinances have requirements for Special Exceptions: Residential, Commercial, Rural/Agricultural and Industrial. Each differs slightly depending on which District the Exception is in.

For example, in the Rural/Agricultural District a couple exceptions are:

Article VIII Section C – 1. Industrial, manufacturing and commercial operations by Special Exception from the Board of Adjustment when fulfilling the following requirements;

a. Consideration of Planning Board recommendation on the project based on its determination following a public hearing that,

  1. Property currently zoned for industrial, manufacturing and commercial operations is ether unavailable or inadequate for the proposed use
  2. and the proposed use is appropriate and consistent with Town’s Master Plan.

b. Each proposed use must show that it will not infringe on the primary established use of the district.

c. No industrial manufacturing or commercial venture or use shall be permitted which could cause any undue hazard to health, safety or property values or which could be offensive to the public because of noise, vibration, excessive traffic, unsanitary conditions, noxious odor, smoke or other similar reason.

And so forth. There are four more conditions in the Rural/Agricultural District. It is important for the applicant to check the Zoning Ordinances in each District to determine which Ordinance is applicable to the applicant’s case.

By contrast the Industrial Zone in Section VIII concerns were more about off-street parking, loading facilities for freight etc. However, the Special Exception still requires the Zoning Board to consider the Planning Board recommendation on the project.

There was some discussion of when the Zoning Board of Adjustment should hear the Special Exception application – before or after the Walpole Planning Board has made a recommendation. According to Mr. J. Miller, the applicant goes to the Zoning Board first. The confusion is because the Zoning Board’s decision depends on the recommendation of the Planning Board – not the approval of the Site Plan, but the recommendation of the Planning Board. Mr. Miller says it has nothing to do with a Site Plan, it’s the process. So does the Zoning Board hear a Special Exceptions question before the Planning Board has even heard the case. As one board member said, it’s a little like the chicken and egg question.

Ms. Mansouri differed in her opinion stating that the Planning Board must make a decision on a recommendation before the Zoning Board can rule. There will be further discussion of the matter. Currently, when an applicant goes to the Zoning Board first, and an affirmative decision is made, it must state that it is pending the Planning Board’s recommendation.

Also, it was suggested that the application form should be more informative and state the process or steps to getting a Special Exception.

Also discussed was the Checklist. The Checklist is a list of questions about whether or not the applicant has submitted certain items with an application. Some of the questions don’t apply to every applicant so answering them may be waived. Mr. Dalessio said that the Site Plan Review Checklist/Waiver Form must be included with a Site Plan Review Application and that this has been a long-standing requirement.

The meeting broke up about 7:45 p.m.

Respectfully submitted, Marilou Blaine, secretary

Planning Board Meeting Minutes – 11/10/15

Walpole Planning Board

Walpole Town Hall

November 10, 2015 Minutes

 

Presiding Members: Jeff Miller (Chair), Robert Miller (Vice-Chair), James Aldrich (Secretary), Steve Dalessio (Selectboard Representative), Jason Perron, Dennis Marcom. Alternates: Jeff White, Ed Potter. Absent: Board member Kelley Hicks.

Recording: These minutes are unapproved and will be reviewed at the December 2015 meeting for corrections, additions and/or omissions.

Meeting Opened: Mr. J. Miller called the meeting to order at 7:00 p.m.

Roll Call: One board member was absent so Mr. Potter was asked to represent her place on the Board.

Minutes: October 2015 minutes and October 2015 Workshop minutes: Mr.. Perron made a motion to accept both minutes as written. The motion was seconded by Mr. Aldrich and approved by the entire board.

Old Business:

Continuation of a Public Hearing for Ruggiero Processing Facility LLC was postponed at the request of the applicant, said Mr. J. Miller. The hearing will continue at the Planning Board’s next regular meeting. A motion was made, seconded and approved by the Board to continue the Public Hearing on December 8, 2015.

Bensonwood Site Plan Review – Town map 12, Lot 4 , Zoning District Rural/Agricultural and Commercial. Bensonwood Woodworking Co. Inc. of 6 Blackjack Crossing want to use the site for a light manufacturing facility. A Public Hearing was held in September and Bensonwood received a Special Exception from the Walpole Zoning Board of Adjustment at its October meeting to have an industrial facility in an Rural/Agricultural/Commercial District. The Exception was approved pending Planning Board approval of the Site Review Plan.

Mr. Dennis Marcom recused himself from voting as he is an employee of Bensonwood. Mr. White took his place on the seven-person board.

Since then, DES has asked Bensonwood for more information concerning the Alteration of Terrain Permit. Mr. Randall Walter said that the company is working closely with DES and assured the Board that a permit would be forthcoming. Bensonwood cannot begin site work until they receive approval from DES.

Mr. J. Miller asked if the plans were the same as presented. Mr. Walter said yes. He then asked the Board if they had any questions. The Board did not.

A motion was made and seconded to approve the Bensonwood Site Plan contingent on the approval from DES. The Board voted unanimously in the affirmative. Mr. Walter will get back to the Chair and Vice-chair so they can sign the plat when the situation with DES is sorted out.

Gay Subdivision: Ms. Joanne Gay of 30 Cray Road asked for a subdivision of property she owns at 1072 Main Street in North Walpole. Map No. 28 Lots 124-1 and 124. Mr Bill Lawrence spoke for Ms. Gay and explained where the property was – near the elementary school in North Walpole. The property at 124 has a house on it and it is where Ms. Gay’s  parents lived before they died. She has a buyer for the house and a portion of the lot so she would like to divide the lot so a portion goes with her parents’ former house and a portion goes with her house and land at 124-1. Mr. Miller asked if there were any questions. There weren’t so Mr. Miller closed the Public Hearing.

New business: Mr. Chip O’Brien was representing Hubbard Farms and requested a Public Hearing for next month for a Subdivision at the Hubbard Farms office property at 195 Main Street. There would be three divisions of property: the office building, which will go on the market to be sold, the barbecue pit, which will be donated to the town, and two buildings that back up to Route 12. There two buildings are used for storage and maintenance. There’s emergency vehicle access to both those buildings.

Mr. R. Miller made a motion to hold a Public Hearing next month, Mr. Aldrich seconded the motion and the Board voted in the affirmative.

Vote on Ms. Gay Subdivision: Mr. Miller asked if there was any discussion. Mr. Dalessio asked if Ms. Gay owned both pieces of property. Mr. Lawrence said she did. Mr. R. Miller made a motion to accept the request as proposed, the motion was seconded and approved unanimously by the Board.

Potato Barn on Potato Barn Lane: Representing the property owner, Mr. Steven Rudek, were Matt Blanc of Blanc & Bailey Construction, Inc. and Barry Bellows of Bellows Construction. They were replacing the former construction companies that were doing the work.

The purpose of coming to the Planning Board meeting was to amend the original site plan. Mr. Blanc wants to remove a 24-foot section of the connector from the Potato Barn so that the connector could be used while the Barn is still under reconstruction and updating. Mr. Blanc said some things had been accomplished, some things remain to be done and he wanted to talk about a few tweaks and changes. Mr. Blanc wanted to know if the Board wanted to have him come back for a full review or if the original site plan could be amended.

Mr. Blanc gave a list of what has been completed so far:

Town water and sewer in place

Fire Hydrant installed (2)

Road is complete with drainage

One bathroom has been installed

New siding and roof will be completed in 2015

Bridge work completed which includes structural reinforcing and road widening

New electrical service – 200 AMP Service

Outside light completed in 2015

The benefits of separating the connector from the barn are:

Fire separation

Since there is a water problem, drainage may be made through the new space between the barn and connector and use it as a swale

The ability to rent the connector space prior to the barn being completed.

Multiple tenants

Additional ventilation or light to areas of the main barn

Potential for access into full basement of main barn and connector.

There are no tenants at this point but there are prospects for both the connector and for the barn. The connector is pretty close to being ready for occupancy. The barn will take longer and the plan is not to go too far along until a tenant is known. So the intent right now is to get the barn beautified.

What Mr. Blanc was proposing was to separate the connector to get square footage down, have tenants occupy the connector. This would mean that they could go ahead without putting a sprinkler in. If the connector was not separated, then the square footage of the entire building would mean a sprinkler had to be put in. If the sprinkler in the barn was installed, it would have to be refitted once a client is found, Mr. Blanc said, it would be very expensive to retrofit.

Another challenge is that there is a lot of water coming off the hillside and the parking lot is a wet area. The plan is to correct that by using the land between the connector and the barn as a swale. That work would be done once access is approved for Route 12.

The state has approved access once, then rejected it. Mr. Rudek will be going back to the state. A couple of tenants need that access before signing a contract.

Also, Mr. Blanc said Mr. Hurlburt was not happy about having tenants in the connector while attached to the barn without it having a sprinkler. It it’s separated, it is under the code for requiring a sprinkler, Mr. Blanc said.. The time line for the connector is to be ready by spring.

Mr. Miller asked if everything else will remain except for the connector and access to Route 12. Mr. Blanc said yes. He continued that the barn is a separate piece. Whenever there is an occupant, they would come back to the Board.

Ms. Mansouri asked about the size of the connector. As it is now it’s 88 feet by about 20 to 24 feet.

Mr. Dalessio reminded them that they will need to renew their building permit. He also asked if the end design is what we see now. Mr Blanc said that depends on the occupants. There may be a change to the windows and doors.

Mr. R. Miller recused himself from voting on the proposal as he works for Blanc and Bailey.

Mr. Potter made a motion to approve the amended proposal to separate the barn and connector with three conditions:

That the Fire Department approves of the separation.

That a schematic that updates what has been done be submitted.

That access to Route 12 is approved.

Mr. Aldrich seconded the motion and it was unanimously approved by the Board.

Other: The Board Members of the Zoning Board of Adjustment wrote a letter to the Planning Board about its Workshop Minutes dated September 22, 2015. The Zoning Board thinks there were  “misconceptions reflected in those minutes” specifically about the Special Exception process. According to the letter, RSA 674.33, paragraph E subset a – states that “the Planning Board has to approve the Site Plan for the area in question, and give a recommendation to the ZBA, prior to the ZBA issuing a Special Exception.”

There were two attachments to the letter: one was a copy of Chapter 674 Local Land Use Planning and Regulatory Powers and one was the Special Exception Ordinance in the Walpole Zoning Ordinance booklet.

Also, Mr. Randall Walter complained about the time the process took to get Site Plan approval when a Special Exception is needed. Mr. Randall said he first came to the Planning Board in April for an informational meeting. He came back on August 11, 2015. He said he requested to be on the agenda for the next month. There was no vote but he doesn’t know “what that was about.” He came back on Sept 8 and presented his case to the Public. He was told he had to go to the Zoning Board first for a Special Exception. Although Bensonwood was on the agenda for the October meeting, he did not attend the meeting. On October 14, he attended a Zoning Board meeting for a Special Exception and the ZBA said the opposite –  that they had to have permission of the Planning Board. And so finally Nov. 10, the Planning Board voted on the Site Plan Review.

“So my question as an applicant is where is the road map?” Mr. Walter asked. “Where is the road map to who goes first, which Board is contingent on which Board. I think this was poorly handled.” Mr. Walter said he was a former member of the Keene Zoning Board and it was always Planning first. Conditional approval is very messy. And it requires people to come in and use extra time.

In theory you should be able to go to your town and say I want to be on the agenda. And  you should be able to go through the checklist and go right to a hearing, So a lot of time has been added. “I don’t think that’s the goal of the New Hampshire Statutes.

Mr. Miller said the first time Mr. Walter appeared the Board was a little confused on whether or not he wanted a hearing. The secretary said a hearing was not asked for and there was no vote to have a Public Hearing. From his remarks it seemed he was going to come back to explain the major changes in this plan from the former plan in 2008 and then request a hearing.

Mr. J. Miller said the process will be discussed.

Monthly Workshop: Mr. J. Miller said since the workshop would have to be held during Thanksgiving week, that there would not be a workshop this month.

The meeting was adjourned at 7:50 p.m.

Respectfully submitted,

Marilou Blaine

Planning Board Agenda – 11/10/15

PLANNING BOARD AGENDA

WALPOLE TOWN HALL

Tuesday, November 10, 2015

7 p.m.                         

 

Roll Call – Appointment of alternates if needed

Minutes – Review minutes of the September meeting and Workshop meeting.

Old Business:

Public Hearing for a Site Plan Review – (continued from September meeting) Ruggiero Processing Facility, LLC, 32  Industrial Park Road, Map 1, Lot 10-1, Zoning            District Industrial – wishes to add another 2,500 square-foot pole barn, new access road,          trailer for employee break room and a scale near the entrance to the property. Joe Ruggiero owner, Rob Hitchcock of SVE Associates, Tom Hanna, lawyer.

Bensonwood Site Plan Review – Town Map 12, Lot 4, Zoning District Rural/Agricultural and Commercial: Huntington Realty of Walpole LLC, Bensonwood Woodworking Co. Inc. of 6 Blackjack Crossing, Town Map 12, Lot 4-3. Bensonwood wants to use the site for light manufacturing facilities to produce and assemble wall, floor, roof and mechanical systems for construction. The new shop space will be 55,000 square feet. Had a hearing with Zoning Board for a Special Exception on October 21, 2015.

             Joanne Gay, 30 Cray Road and 1072 Main Street. Map No. 28 Lots 124-1 and 124,     respectively. Subdivision, North Walpole  – Ms. Cray wants to subdivide Lot 124 and add to her property Lot 124.

            New Business:

            Hubbard Farms LLC, 195 Main Street, Request for a Public Hearing for a Subdivision.

            Amend Site Plan – Potato Barn The plan is to split the connector and the main barn into two permits as the connector is going to be ready for occupancy by the end of the year and the barn will be under renovation for some time after that which will be largely determined by whatever time it takes to find a tenant and complete their required fit-up. So the change from the 2012 permit would include removing 24’ of the connector where it attaches to the barn so an occupancy permit can be granted and the building be occupied. The barn would remain as a stand-alone permit which would get a new application once a tenant commits to the space and the end use is known. Matt Blanc Richard Harding.

Planning Board Meeting Minutes – 10/13/15

Walpole Planning Board
Walpole Town Hall
October 13, 2015 Minutes

Presiding Members: Robert Miller (Vice-Chair), James Aldrich (Secretary), Steve Dalessio (Selectboard Representative), Jason Perron, Dennis Marcom. Alternates: Jeff White and Ed Potter.
Absent: (Chair) Jeff Miller and Board Member Kelley Hicks.

Recording: These minutes are unapproved and will be reviewed at the November 10, 2015, meeting for corrections, additions and/or omissions.

Meeting Opened: Mr. R. Miller called the meeting to order at 7:01 p.m.

Roll Call: Two board members were absent so both alternates were needed to fill in for the board.

Minutes: For the September 8, 2015, regular meeting and a September 22, 2015, workshop meeting. Mr. Marcom pointed out two typos in the regular minutes – eastwood was changed to eastward and on the next page immature was changed to premature. Mr. Aldrich made a motion to accept the minutes as corrected. The motion was seconded and approved by the entire board.

Old Business: Mr. R. Miller reopened the Public Hearing, Site Plan Review, for Ruggiero Processing Facility, LLC., a continuation of the August 11 and August 17 meetings.

Mr. Tom Hanna spent the first 15 to 20 minutes going over a written statement that outlined his view of the role of the planning board in a case where there’ are comprehensive regulations under statute RSA 149-M. He also included what he thought were misconceptions by the public that he had heard over the last few weeks.

The following is the written statement Mr. Hanna gave to the Planning Board. He did not always read the statement and sometimes paraphrased the content. Here it is.

Introduction: The hearing tonight is a continuation of hearings on August 11 and the site visit on August 17. The purpose of this memorandum is to outline the Planning Board’s role in light of the comprehensive regulation of solid waste facilities by the NH Department of Environmental Services (DES) pursuant to state law ( RSA 149-M). In addition, this memorandum will clarify and correct certain rumors and misrepresentations that have infiltrated the process, as well as provide an overview of pertinent facts. The willingness of Ruggiero to be transparent with its proposed activities should not be construed as an acknowledgment that the Planning Board has jurisdiction over the issues addressed in this memorandum. Rather, Ruggiero intends to be part of this community for the long-term future, and it has no reason not to be open about is proposed operations.

Ruggiero has filed a site plan with the Planning Board to inform the Board of the following modifications to the previously approved site plan. The changes are as follows:
1. Installation of a new access driveway over Ruggiero property. Ruggiero has previously accessed the site via an existing gravel road over Hodgkin’s property, but DES prefers that Ruggiero have access over its own land.
2. Addition of two pole barns, one that already exists and another which is 100 feet by 25 feet.
3. Installation of a scale near the new access driveway.
4. New office near the scale.
These modifications coincide with a detailed application to DES for a permit to collect, store and transfer Municipal Solid Waste (MSW), in addition to the collection, storage and transfer of recyclable materials and Construction and Demolition Debris (C&D), which Ruggiero is already permitted to process.

Facts/Clarifications:
​The following bulleted facts and/or responses will further explain the proposal and the Planning Board’s role:
​
Dump: This is an incorrect term to describe the proposed transfer facility. No waste materials will be tipped onto the ground. Nothing will be buried. MSW will be dropped on the floor of a contained building, and after recyclables are removed, transferred to a bulk container. The MSW is then moved off site, typically within 24 hours and never more than 72 hours after arrival on site. The operation is a transfer facility.

What is Municipal Solid Waste (MSW)? MSW means “solid waste generated at residences, commercial or industrial establishments, and institutions, but excluding construction and demolition debris, automobile scrap and other motor vehicle waste, infectious waste, asbestos waste, contaminated oil and other absorbent media and ash other than as from household stoves.” See NH Env. SW 103.47.

Garbage. This term has been misused. The primary definition of garbage, according to Webster’s dictionary, is food waste. Joe Ruggiero states that surveys indicate that MSW from residences typically includes up to 30 percent of garbage (by weight). “At my house, where we compost, I would say our MSW comprises about 5 percent of garbage.” (Secretary’s Note: This is where the chicken-bone reference comes in in a later comment in the Public Hearing. Mr. Hanna states that his percent of garbage contains barely more than a chicken bone.)

Odor. Off-site odor will not be a problem because MSW will typically be transferred within 24 hours and never will the transfer occur more than 72 hours after arrival. Once Ruggiero begins bringing MSW to the transfer facility, a mister machine will be installed in the building where the MSW is dumped on the floor and sorted. The mister will be utilized, if necessary, to control any odors.

What happens to MSW when transferred off site? It goes to one of several disposal sites, including for example, without limitation, Springfield, MA, Berlin, NH, Coventry, VT. Wherever it is most cost-effective to transfer at a given time.

How many tons of MSW will typically be brought to the Walpole site for sorting and transfer on a daily basis? 10 to 25 tons/day, which translates into approximately 20 trucks per day, a fraction of the trucks entering the Industrial Park on a daily basis.

Area of operation. The current operation covers about 3 to 4 acres. The application to DES and the site plan application will not enlarge this area appreciably.

Composting. Ruggiero has not applied for a permit to compost and would have to do so if composting is contemplated in the future.

Rodents. The proposal is not likely to cause a rodent problem because the MSW is typically transferred off site within 24 hours and the (Secretary’s Note: Mr. Hanna mentioned there are 4 on-site) cats are a tried and true deterrent to a rodent problem. Mr. Ruggiero discussed this issue with a pest control specialist and was told that none of the typical measures taken by a pest control firm would be as effective as the cats.

Closest abutting house. 400 to 500 feet as measured on Google Earth.

Role of Planning and Zoning Boards.

The New Hampshire Supreme Court case, North Country Environmental Services, Inc. v. Town of Bethlehem, 150 NH 606 (2004), decided the extent to which towns may regulate solid waste facilities. The facts are similar to the facts in the Ruggiero application.

Regulation of solid waste facilities is conducted exclusively by DES, under a comprehensive regulatory state (RSA 149-M), except as set forth below. Because of the comprehensive regulatory scheme, the State has “preempted” local regulation.

Specifically reserved to DES is regulation of the following: structures, footprint, content, (i.e. material handled), operations, slopes, heights, drainage, water quality impacts, and all other subject matters that are reviewed as part of the DES permitting process.
​
Under the statute, the Court said, a town may regulate the location of the solid waste facility, such as through zoning, “if done in good faith.”

The Walpole ZBA’s decision of February 21, 2011, granting Ruggiero a special exception to operate a solid waste processing facility on Industrial Park Road, was within the town’s authority to regulate the location of the facility.

However, any attempts by any Town Board to regulate the operations of the solid waste facility, the type of materials collected for transfer (such as MSW), the size or footprint of buildings, or to prohibit any expansion of DES-regulated activities at the approved location, directly conflicts with the state’s permitting authority and are thus preempted by the State.

This is the end of Mr. Hanna’s written statement.

In Mr. Hanna’s dicussion of the role of the planning board. Mr. R. Miller asked, “Does that mean our site plan and zoning has no weight?”

Mr. Hanna said, “Yes, that’s pretty much it.”

Operations of the facility, slopes, height, water quality have been deemed by the NH Supreme Court – in the Bethlehem case – a state authority. There have been many attempts to have town boards regulate these things and prohibit any expansion but that directly conflicts with the state’s permitting authority.
“I know you don’t like to hear it, “ Mr. Hanna said.

Mr. Dalessio asked if the map that’s was on the easel was the latest drawing of the property because it is different than the one the board has. The map the board had was submitted with the application Aug 5, 2015. The maps were different. Mr. Dalessio said, “right now we don’t have a copy of that drawing.

“We have a 7 / 21 drawing – the drawing that’s being presented tonight does not match the ones that we have in our files. So I don’t know how we can make a decision on a drawing we don’t have. Look at application. You did not present a colored plan to the board.”

Mr. Rob Hitchcock, the surveyor, said he used colored plans on the board to make it easier for the audience to view.

Mr. Dalessio asked, “How do I know if that drawing is technically different than the one submitted with the application. If you want, I’ll sit here and do a line by line audit and maybe we’ll get done by 11 o’clock tonight. If it has been submitted, the fact is that this board doesn’t have authority to make a decision on this matter anyway.”

Mr. James Aldrich asked Mr. Hanna, “Why are you here tonight before this board? Why not go back to the Zoning Board? In 2011, the number 4 condition was that Mr. Ruggiero could not expand his business without going back to the ZBA.”

The application was filed before I got involved in this matter, Mr. Hanna said. But the board really doesn’t have authority to do anything about it.

The one exception to the state’s perception is that the town has a right to the location of a waste sight. It did that in 2011. What’s being proposed now are operational changes being regulated by DES, Mr. Hanna said.

But the 2011 letter says operations may not be changed or expanded without returning to the ZBA for permission, Aldrich insisted.

The state regulates operations. The ZBA can’t impose conditions for which it has no jurisdiction, Mr. Hanna said. So once it was determined that the location was acceptable for a solid waste facility the types of proposals that are now in play are operational proposals and the state has preempted that. Changing from destruction debris to municipal solid waste is operational.

Mr. Jeff White asked about the mister. Since there is no town water at the site, are you going to dig a well? Where is the drained water going to?

Mr. Joe Ruggiero explained that the mister comes from a 55 gallon drum. It is a deodorant you buy like Fabreze. It drains into a tank that has a shut-off valve.

Mr. Dalessio asked Mr. Ruggiero when he takes possession of the waste. In the site walk, Mr. Ruggiero said it was once it hits the sorting building’s floor. When does the clock start on the 72 hours? Asked Dalessio.

Mr. Ruggiero clarified this and said that according to DES once the dumpster is on site, that’s when the clock starts.

Mr. Hanna said he send a document to the chair – it really was a memo with a cover letter. No one on the board was aware of any memo.

Someone asked about the application. The application was received application by the Town Clerk months ago. It is on line, Mr. Dalessio said.

Tara Sad, state representative for the town of Walpole read from the RSA 147 rule 9 under 7 permitting.
It says, VII. The issuance of a facility permit by the department shall not affect any obligation to obtain local approvals required under all applicable, lawful local ordinances, codes, and regulations not inconsistent with this chapter. So, Sad continued, this statement says that the facility has to come to the towns.

Mr. Dalessio interjected. “So I’m stuck there, I have two different opinions.”

Mr. Hanna added “as long as the local regulation are not inconsistent with state regulatory scheme.”

Sheila Lennon, a local resident said she was really confused. “I talked with Paul Gildersleeve and another woman at DES. You said state regulations override local regulations. Both of these people at DES said ‘no that is not true.’ You have to get local permission as well as state permission.”

Ms. Joan Larkin said if she were not mistaken when you applied for this it was for construction debris. Now all of a sudden we’re bringing in a dump – if you say one thing to begin with, how can I trust this company not to come with something else.”

Mr. Hanna said every party granted a land use permit is allowed to go back to DES. In this case it was granted a permit for construction debris and so only construction debris is allowed on that property. Mr. Ruggiero is going through this process to get the additional permit.

If we did a little tour tomorrow morning would we find any MSW on that property? Mr. R. Miller asked.

Mr. Hanna said you may find a little amount. When he was building his house, he might throw a coffee cup into a dumpster as he passed.

Mr. R. Miller continued. I’ve been a 28-year resident on Blackjack Crossing and in the last month I’ve seen more MSW trucks going down the road – and not with construction debris.” Mr. Miller asked where his trucks were going. Mr. Ruggiero answered “Jaffrey.” He said he had a lot of customers on Blackjack Crossing and Wentworth Road.

Mr. Aldrich read from Article VII of Zoning Ordinances in the Industrial District part E. “ No commercial venture or use shall be permitted which would cause any undue hazard to health, safety or property values or which could be offensive to the public because of noise, vibration, excessive traffic, unsanitary conditions, noxious odors, smoke or similar reason.”   “Twenty trucks a day down there is excessive traffic,” Aldrich added.
​
Mr. Hanna asked how many trucks does Old Dominion had. Mr. Aldrich didn’t know but this was additional trucks.

Mr. Eric Merklein said this should be a concern to the town. He said the town doesn’t have a health or safety officer. Mr. Dalessio corrected Mr. Merklein and said there was a health officer. Mr. Merklein continued and asked who was going to inspect this area. He didn’t trust the Waste Facility to do it. “Who is going to look out for us? This job takes experience. The state is not going to be here for us.”

Mr. Ruggiero said, ”I would think a health officer would do whatever you would do if your septic overflowed. Have the homeowner clean it up, get it fixed or have a cease and desist order.”

Some one from the audience said, “There is zero oversight.” Mr. Ruggiero said he is inspected by the state.

Mr. Cliff Cooke wanted to know about the tax situation. How much does he pay now, how much will he pay? Mr. Ruggiero said he paid about $1,700 when he came and now pays $10,000. Mr. Dalessio pointed out that the $1,700 tax was because the property was in current use when he purchased it. Mr. Dalessio continued that he didn’t know what the tax would be but an assessor would go out and look at the operation and come up with an assessment.

Mr. Frank Anderson said his property would be affected by the MSW going in and asked if he would get an abatement. Mr. Dalessio said he didn’t know.

Ms. Pauline Barnes said she would like to remind the Planning Board that they are stewards of this town. She asked if the board had gotten the opinion of a lawyer. “Mr. Hanna is making certain legal claims. Shouldn’t a lawyer representing the town be present? It’s hard for you as non lawyers to respond.”

Also, she said, there’s a brook or a stream running close to this property. Has that been addressed? she asked. Contamination should be been considered.

The brook Ms. Barnes was referring to was Houghton Brook. The issue is being addressed. Mr. Hitchcock said. The sorting floor is tipped so the liquid drains into a 1,000 gallon holding tank and an alarm goes off when it is nearly full. Then it’s taken off site and drained.

Mr. Hitchcock said Mr. Paul Gildersleeve at DES said no record of any contamination of groundwater or stream has ever been recorded due to a leaking dumpster.

Someone from the audience asked if the board was going to get legal counsel. Mr. R. Miller said he is pushing for that.

Mr. Stefan Stefanko said to Mr. Hanna that he thinks he has probably a little more trash than the occasional chicken bone. There are dirty diapers, cat litter all other kinds of things going into the stream of waste. Mr. Hanna said he was only talking about my own situation. Mr. Stefanko asked him just to be honest about MSW is. It is clear more goes into this waste than a chicken bone. Mr. Hanna countered that if it’s clear why are you making a case about it? Because Mr. Stefanko said, you’re an attorney and you’re making it point of how little goes into the waste stream with the comment about the chicken bone. Let’s be honest about it – it’s dirty diapers, cat litter and a lot more.

Mr. Stefanko said his question of Mr. Ruggiero was “How can we trust you?” You came to the Zoning and Planning Boards and presented a case for construction debris. When did you change your mind? It’s like the vacuum cleaner salesman, the guy who gets his foot in the door. There has to be a level of trust. You start out by saying your are going to do “X” and somebody brings you something and then you are doing “Y”. The public has to now worry about you doing “Z.” Why should we believe you?

Mr. Ruggiero said the decision was made about eight (8) months ago. About that time recycling was mandated in Vermont so Ruggiero started picking up people’s trash. He wants to be able to bring it to his facility in Walpole.

Mr. R. Miller pointed out that the have town has an award-winning recycling center, very well run, clean and neat. It is managed by Mr. Paul Colburn. “We don’t need Vermont’s MSW, New Hampshire’s MSW, coming to our town” he said.​

Paul Colburn said Garry’s Rubbish, who is from a firm in Claremont, collects Charlestown’s rubbish and it’s all dumped in Charleston. The same things with their recyclables. Every town has a transfer station. Why not dump Walpole’s garbage in Walpole. Why not dump it in the town where it’s collected?

Mr. Ernie Vose said that the town subsidizes the recycling center. “It’s on the warrant every year.”

Mr. Bob Anderson asked Mr. Ruggiero, “Are you planning to go before the Zoning Board of Adjustments or does that Board have to take you to court to get you there?”

“I said,” Mr. Hanna interjected, “in my opening statement.” The ZBA’s decision in 2011 was a special exception granted for construction and demolition debris. It’s a solid waste facility.

Mr. Aldrich took exception to calling it solid waste – you said solid waste was MSW, this is commercial or industrial. You’re confusing me. My interpretation of the law based on the statute and the Supreme Court cases that have been decided, where the Zoning Board said that the special was subject to “Operations may not be changed or expanded without returning to the ZBA for permission.”

“The Zoning Board does not have the authority to regulate the operations of this solid waste facility, only the state does. So we wouldn’t go back to the Zoning Board.” Mr. Hanna said.

France Menk said she was here to learn about this very contentious issue. “I just ask everybody to respect everybody else’s intelligence. There’s a lot of arrogance going around.”

Mr. Anderson asked Mr. Ruggiero to explain where he is currently sorting his MSW. Mr. Ruggiero said, “wherever I can, Jaffrey, Newport, Shaftsbury.” He then brings back the recyclables to Walpole to put it with his other sorted recyclables. “It doesn’t make sense,” he said. “That faculty is there now and I’m driving a way over to Jaffrey.” He said he had to absorb the cost.

John Peska said the award-winning recycling facility is on three acres. This facility is 13 acres which is larger than the city of Keene. This is a 3700 person community.

Mr. Phil Carroll asked “What is the potential size? Couldn’t you potentially go there? Could all 13 acres be dedicated (to as waste facility)? “

Mr. Hanna said, “I’m focused on the permit. I don’t know what to say.”

Mr. Carroll continued, “Are there any restrictions on this? What are the limits? How big could it get.”

Mr. Hanna said he had no idea.

Mr. Adrian Basora said Mr. Hanna was insulting our intelligence here because he is alleging that we had no grounds to stand on. The Planning Board needs to consult legal counsel to see if Mr. Hanna‘s views are correct. “I find it hard to believe there is no action the town can take to stop this.”

Mr. Anderson said it sounded to him that there might be a potential for a legal case. Someone said the town should look into it and urges the Planning Board to take a vote and see.

Mr. Hanna said, I don’t think this board would ever say I tried to insult someone’s intelligence. To the extent anyone feels that way, I apologize. I was getting questions from several people and trying my best to answer them. And I’ll continue. I don’t think I have lack of respect for people’s intelligence, including yours (referring to Mr. Basora).”

Mr. Bob Anderson asked Mr. Ruggiero if he would be willing to limit the future scope to agree to operate on a 4-acre footprint. “That would eliminate a lot of the fear of how big you are going to get.”
​
That is not a question an applicant should be forced to answer, Mr. Hanna said.

Mr. Carroll said it wouldn’t be binding.

Mr. Rich Francis said the audience hasn’t been paying enough attention to what’s allowed to be there and the operation and the facility itself. Jurisdiction doesn’t mean they can allow anything to go in there. He said to him this facility is permitted for building and other construction waste and that the state can regulate that all they want. But doesn’t mean it can municipal waste into that steam.

Ms. Lennon mentioned a fire in Salem at a waste facility. It was a five alarm fire and it took 10 million gallons of water to put out that fire.* “Are we prepared for an emergency of that scop,” she asked. Suppose something goes into the river? The town doesn’t want to be responsible for a future hazardous cleanup.

The public hearing was closed and there was a short 2-minute break.

After the break Mr. Dalessio said we are in no position to take make a decision until we get the right map, truly the right documentation.

Mr. Aldrich said he thought the Zoning Board and their jurisdiction should be in that too. Mr. Dalessio said the confusion from DES emails about how the complies is confusing. “I think we have to get that clarified before we vote.”

Mr. Marcom made a motion to defer the decision until such time as we have a discussion with our town lawyer about the our authority and the ZBA authority, until we have a complete site plan review and have the right documentation and then how it relates to the comments and decisions made by DES.

The motion was seconded by Mr. Aldrich and unanimously agreed to by the Board.

In Other Business

Hubbard Farms had postponed their hearing until next month.

No one from Bensonwood or the Potato Barn was in attendance.

New Business

Ms. Joanne Gay requested a Public hearing for next month for a subdivision of her property in North Walpole. A motion was made by Mr. Aldrich to hold a hearing in November. The motion was seconded by Mr. Marcom and the board approved unanimously.

The meeting ended about 8:40 p.m.

Respectfully submitted,
Marilou Blaine
Secretary

*Ms. Lennon emailed the secretary the next day and her email said “Fire officials estimate they used about 1 million gallons of water from three different sources-small yard hydrants on the property, the regular municipal hydrant on Route 38 and water from Hedgehog Pond.”

Posted: Town Offices, outside bulletin board of Walpole Grocery.
Cc: WPB, ZBA, The Walpolean.org, http://www.walpole.nh.us.

​

Planning Board Agenda – 10/13/15

PLANNING BOARD AGENDA

WALPOLE TOWN HALL

Tuesday, October 13, 2015

                        7 p.m.                         

 

Roll Call – Appointment of alternates if needed

Minutes – Review minutes of the September meeting and Workshop meeting.

Old Business:

Public Hearing for a Site Plan Review – (continued from September meeting)           Ruggiero Processing Facility, LLC, 32  Industrial Park Road, Map 1, Lot 10-1, Zoning District Industrial – wishes to add another 2,500 square-foot pole barn, new access road, trailer for employee break room and a scale near the entrance to the property.  Joe Ruggiero owner, Rob Hitchcock of SVE Associates, Tom Hanna, lawyer.

Postponed until November. Public Hearing Site Plan Review Site Plan Review: Hubbard Farms LLC, 44 Upper Walpole Road, Town Map 12, Lot 57-1, Commercial District. Hubbard Farms wants to convert the building currently used for vehicle space into office space and a laboratory, add a 20-by-80-square-foot space to the back of the building, and another 20-by-24-square-foot addition to the back. The larger space will be used to house vehicles and the smaller space for a loading dock. Chip O’Brien is representing Hubbard Farms.

Bensonwood Site Plan Review – Town Map 12, Lot 4, Zoning District Rural/Agricultural and Commercial: Huntington Realty of Walpole LLC, Bensonwood Woodworking Co. Inc. of 6 Blackjack Crossing, Town Map 12, Lot 4-3. Bensonwood wants to use the site for light manufacturing facilities to produce and assemble wall, floor, roof and mechanical systems for construction. The new shop space will be 55,000 square feet. Waiting for special exception and variance from Zoning Board. Hearing on October 21, 2015.

New Business:

Amend Site Plan – Potato Barn The plan is to split the connector and the main barn into two permits as the connector is going to be ready for occupancy by the end of the year and the barn will be under renovation for some time after that which will be largely determined by whatever time it takes to find a tenant and complete their required fit-up. So the change from the 2012 permit would include             removing 24’ of the connector where it attaches to the barn so an occupancy permit can be granted and the building be occupied. The barn would remain as a stand-alone permit which would get a new application once a tenant commits to the space and the end use is known.

Subdivision – North Walpole – Joanne Gay, Cray Road.

Next meeting  Nov. 10, 2015 Cc: PB, Town Offices, Walpolean. Minutes posted: Town Hall Lobby, Outside bulletin board of Walpole Grocery, http://www.walpolenh.us